After every system has been built we have a team of engineers to thoroughly run and verify each component, sub-assembly and finally the entire system. We also assist our customers for conducting a comprehensive and well documented FAT at our manufacturing site. System functionality is qualified, verified, and documented in an exception report & remediated prior to shipment.
The Factory Acceptance Test includes conducting a series of tests, which prove that the equipment is designed, executed and works in the agreement and according to the user’s requirements. The test may include performance, physical or chemical investigation; and is performed at the site of the manufacturer of the equipment. It’s very important that the testing is approached seriously and prepared.